İZMİT BRIDGE PROJECT III

HESAP : KAMIGUMI / IHI INFRASTRUCTURE CO.
KARGO : Crane
HACİM :

LxWxH : 10000x 2500 x 4200 mm // 27000 KGs

LxWxH : 8870 x 3700 x 4110 mm // 15000 KGs

YÜKLEME TARİHLERİ : September, 2014
TESLİM YERİ : Yasarsan Shipyard Yalova, Turkey
YÜKLEME YERİ : Yokohama, Japan

PROJE KAPSAMI

• Sea Transportation ex Yokohoma to Derince by Heavy Lift Vessel

• Arranging Discharging into Storage Area at Limas Port

• Transportation from Port to Outside Closed Warehouse after Import Clearance Done in Order to Protect the Cargo and Diminishing the Storage Costs.

• Arranging Transportation from Warehouse to Delivery Point at Yalova.

• Discharging at Jobsite Yasarsan Shipyard.